Metaloterm MF Case Studies

Metaloterm MF Case Studies


Blackminster Care Home Worcester Project
Blackminster Care Home Worcester Project

Greggs Distribution Centre Project
Greggs Distribution Centre Project

Warriner School, Banbury Project
Warriner School, Banbury Project

Gunnersbury Park, London Project
Gunnersbury Park, London Project

Hackney Academy Project
Hackney Academy Project

Greenwich College Project, London
Greenwich College Project, London

Bunhill 2 Energy Centre Project
Bunhill 2 Energy Centre Project

185
International
resellers
4.000
Products
75
years Schiedel
Metaloterm

News

Ontop B.V. at ISH 2019

Ontop B.V. showcases flue gas systems at ISH 2019 in Messe, Frankfurt.

Read more

Schiedel Metaloterm starts flex production

Schiedel Metaloterm B.V. announces the start of its new production line of flexible stainless steel flue gas ducts.

Read more

The lateral draincap has been introduced to the range to allow for the capping off of header/cascade systems, whilst enabling condensate to be gathered and drained off effectively through the standard 3/4" drain fitting.

Read more


More news

Contact

Resellers